---
title: "Alpha ESS Aster TB500-EX01 1410.73 kWh All-in-One Battery: Specs & Datasheet | ComparePV"
description: "Alpha ESS Aster TB500-EX01 1410.73 kWh all-in-one home battery. Specs: 500.0 kW continuous, 23000.0 kg."
source: "https://comparepv.com/battery/alpha-ess-aster-tb500-ex01"
updated: 2026-11-14
---

# Alpha ESS Aster TB500-EX01


## Identity

- **Manufacturer:** Alpha ESS
- **Model:** Aster TB500-EX01
- **Series:** Aster TB
- **Usable energy:** 1410.73 kWh
- **Voltage class:** High voltage
- **Cell technology:** LFP
- **Built-in inverter:** yes


## How it compares

Compared against 315 batteries of 50 kWh and up. Ranks are within that class.


| Measure | This battery | Class median | Standing | Rank in class |
| --- | --- | --- | --- | --- |
| Round-trip efficiency | - | 93.0% |  |  |
| Power per kWh | 0.35 | 0.52 | Weak - bottom 14% | 198 |
| Cycle life | - | 8000 |  |  |
| Weight per kWh | 16.3 | 10.4 | Weak - bottom 13% | 215 |
| Warranty | - | 10 yrs |  |  |


## Specification


### Capacity

- **Usable energy:** 1410.73 kWh
- **Nominal energy:** 1410.73 kWh
- **Module energy:** 52.24 kWh
- **Max system capacity:** 8464.4 kWh
- **Units in parallel:** 6


### Power

- **Continuous discharge power:** 500.00 kW
- **Continuous charge power:** 500.00 kW
- **Max discharge current:** 880 A
- **Max charge current:** 880 A


### Cells and voltage

- **Voltage class:** High voltage
- **Nominal voltage:** 748.8 V
- **Operating voltage:** 632 to 842 V
- **Cell technology:** LFP
- **Cell management:** Cobalt-free, Thermal management


### Built-in inverter

- **Inverter power:** 500.0 kW
- **Phases:** Three-phase


### Physical

- **Dimensions:** 2896 × 6058 × 2438 mm
- **Weight:** 23000.0 kg
- **Enclosure:** IP55
- **Mounting:** ground
- **Outdoor installation:** Yes
- **Cooling:** liquid
- **Operating temperature:** -30 to 50 °C


### Compatibility

- **Protocols:** RS485, CAN, TCP


### Warranty and certificates

- **Certifications:** UN38.3, UN3536, IEC 62619, IEC 62477, IEC 61000, UL 9540A, CE (LVD) - IEC 62477, CE (EMC) - IEC 61000, EN 50549-1:2019, G99, AS/NZS 4777


### Pros

- **Liquid cooling extends cell lifespan** - The TB250/TB500 system uses liquid cooling to maintain stable LFP cell operating temperature and reduce thermal degradation - compared to air-cooled C&I storage of previous generations - resulting in longer service life and higher sustained power output under high-temperature conditions.
- **Flexible integration with 400V and 800V PV** - Compatibility with both 400V and 800V PV systems (a single 500 kVA PCS with AC 400V or AC 800V transformer options) lets integrators connect the storage system to existing installations without additional voltage converters, lowering BoS costs and shortening deployment time.
- **Scalable up to 3 MW / 8.46 MWh** - Parallel connection of units allows the system to scale from a single 250-500 kW container to a cluster with power up to 3 MW and capacity up to 8.46 MWh, serving both mid-sized industrial plants and large-scale PV farms without changing the system architecture.
- **Multi-tier fire protection** - Cell-, module- and system-level protection combined with UL 9540A certification and an IP67-rated battery enclosure (IP55 at system level) provides a higher fire-safety margin than solutions relying solely on system-level protection, which matters for installations at industrial sites.
- **Tier-1 manufacturer with 13 years of track record** - Alpha ESS has operated since 2012 and holds tier-1 bankable status, which increases project financing confidence for banks and investors and supports stable parts supply and after-sales service across the EMEA region.


### Cons

- **Short track record (2025 launch)** - The Aster TB250/TB500 series launched in 2025, unlike competing C&I platforms (e.g., Sungrow PowerTitan, Huawei LUNA2000-C) that already have several years of field deployment - there is no long-term data on degradation and failure rates under real-world operating conditions.
- **Inconsistent technical specs in manufacturer materials** - Official AlphaESS sources list conflicting capacity figures for this series (e.g., 235-1,612.8 kWh on one product page vs 705-1,410 kWh in the brochure), making it harder for integrators to size configurations precisely and requiring verification with a local representative before quoting.


## About this series

The Alpha ESS Aster TB250/TB500 series is a **liquid-cooled energy storage system** in the C&I class, designed for businesses and industrial facilities that want to maximize self-consumption of energy from their own PV installation and reduce losses from renewable curtailment. This solution addresses a real problem faced by large energy consumers, where the variability of solar production and rising energy costs demand a flexible, on-demand power buffer. A key advantage of the series is its **compatibility with 400V and 800V PV systems**, allowing the storage unit to be integrated with installations of different voltage architectures without additional converters. Another major strength is its **modular scalability through parallel connection** - individual units can be combined into larger clusters, achieving power and capacity levels suited to needs ranging from mid-sized businesses to large solar power plants. The manufacturer places strong emphasis on **multi-layer fire protection**, covering safety at the cell, module, and system level, together with advanced thermal management. The Aster TB series is housed in a compact containerized enclosure, which simplifies transport and on-site installation. This makes it a solid choice for investors and integrators seeking a reliable, safe, and easily scalable energy storage solution for commercial and industrial applications.


## Questions


### What is the maximum capacity and power of a system built from Alpha ESS Aster TB250/TB500 units?

A single Aster TB250/TB500 module delivers 250 to 500 kW of power and 705 to 1410 kWh of capacity, depending on variant. Thanks to parallel connection of up to six units, a cluster can scale up to 3 MW and as much as 8.46 MWh, matching the needs of mid-sized industrial facilities and large solar power plants.


### Can the Aster TB250/TB500 be connected to an 800V PV system without additional converters?

Yes, the Aster TB250/TB500 series is natively compatible with both 400V and 800V PV systems. This means the battery storage can be integrated with modern high-voltage installations without requiring extra DC voltage converters, which reduces cost and complexity on the DC side of the installation.


### What fire protection features does the Aster TB250/TB500 energy storage system have?

The system uses multi-layer fire protection operating at the cell, module, and system level. This includes module-level fire suppression, an independent fire suppression system, and advanced thermal management enabled by liquid cooling, which significantly reduces the risk of thermal runaway propagation compared to air-cooled systems.


### How does liquid cooling in the Aster TB250/TB500 differ from air cooling in cheaper C&I battery systems?

Liquid cooling maintains far more uniform cell temperatures than air-based climate control, resulting in longer battery lifespan and more stable performance even under heavy daily cycling. In industrial installations where the battery operates at full power every day, this precise thermal regulation meaningfully reduces LFP cell degradation over the system's service life.


### What IP rating do the cells and enclosure of the Aster TB250/TB500 have, and can it be installed outdoors?

The LFP cells inside the module carry an IP67 rating, while the entire containerized enclosure is rated IP55. This design allows outdoor installation directly on an industrial site without building a dedicated technical room, which simplifies transport and shortens project deployment time.


### Which industrial facilities benefit most from the Aster TB250/TB500 and how does it reduce curtailment losses?

The series targets companies with their own PV installations that want to increase self-consumption and avoid losses from renewable energy curtailment, which occurs when solar output exceeds instantaneous demand or grid hosting capacity. By storing daytime surplus energy and discharging it during peak hours, a facility cuts grid electricity costs and reduces the risk of forced production curtailment by the grid operator.


## Datasheet

[Manufacturer datasheet (PDF)](https://comparepv.com/datasheets/batteries/Datasheet_AsterTB250_TB500_EN_V24_Print_AlphaESS_15012026-32f337dcc0a8.pdf)


## Alternatives


| Battery | Usable energy | Round-trip | Power | Voltage | Difference |
| --- | --- | --- | --- | --- | --- |
| [INTILION scalepac6](https://comparepv.com/battery/intilion-scalepac6) | 1372 kWh | 90.0% | 750.0 kW |  | -38.7 kWh, +250.0 kW |
| [INTILION scalepac7](https://comparepv.com/battery/intilion-scalepac7) | 1600 kWh | 90.0% | 875.0 kW |  | +189.3 kWh, +375.0 kW |
| [INTILION scalepac5](https://comparepv.com/battery/intilion-scalepac5) | 1143 kWh | 90.0% | 625.0 kW |  | -267.7 kWh, +125.0 kW |


---

Source: https://comparepv.com/battery/alpha-ess-aster-tb500-ex01

